Question 1
A customer has restricted the AP and antenna combinations for a design to be limited to one model integrated antenna AP for carpeted spaces and one morel external antenna AP, with high gain antennas for industrial, maintenance, or storage areas. When moving between a carpeted area to an industrial area, the engineer forgets to change survey devices and surveys several APs. Which strategy will reduce the negative impact of the design?
  1. Deploy unsurveyed access points to the design.
  2. Increase the Tx power on incorrectly surveyed access points.
  3. Deploy the specified access points per area type.
  4. Resurvey and adjust the design.
Correct answer: D
Question 2
WLC SSO is set up between two WLCs in a service provider network serving public spaces. On WLC failover, it is noticed that only about half of the original client count is now showing on the secondary WLC, although it is currently showing the role as active. Which design side case explains the issue?
  1. The secondary WLC platform does not support the required client count.
  2. The WLCs had not completed database sync before the primary failure.
  3. SSO is not configured correctly.
  4. Some client sessions were in WebAuth-Req state before failover.
Correct answer: D
Explanation:
B: 2D: 8 - Mosted
B: 2D: 8 - Mosted
Question 3
Refer to the exhibit. An engineer determined that during a recent controller failure, some APs did not failover to their secondary controller based on the network design, which has sufficient licenses for all APs. The controllers are not in a mobility group but have A records for their hostnames in DNS. Which setting needs to be addressed?
  1. The controllers must be in the same mobility group.
  2. The secondary controller IP address is incorrect.
  3. DNS hostnames are required to be FQDN.
  4. The AP failover priority was not set high enough.
Correct answer: D
Explanation:
B: 1D: 4 - Mosted
B: 1D: 4 - Mosted
Question 4
When a wireless survey is conducted at a customer facility, signal attenuation in an area that is surrounded by thick glass walls is noted as 2dB. When Cisco Prime Infrastructure is configured, which obstacle must be placed in a map editor to represent the impact that the glass wall will have on the RF signal in the facility?
  1. heavy door
  2. glass
  3. thick wall
  4. light wall
Correct answer: D
Explanation:
D: 12 - Mosted
D: 12 - Mosted
Question 5
An engineer must perform a Layer 2 survey for a mining facility. Which type of antenna does the engineer use in the mine shaft?
  1. omnidirectional
  2. patch
  3. internal
  4. dipole
Correct answer: B
Explanation:
B: 8 - Mosted
B: 8 - Mosted
Question 6
A customer has a central Cisco WLC that manages APs in FlexConnect mode. The wireless infrastructure supports multiple small branches. One branch deploys new CCX wireless phones that are authenticated by a central Cisco ISE via PEAP/IMSCHAPv2, and traffic is switched locally. The customer must reduce the number of full authentication requests and optimize roaming for the new phones. Which action accomplishes the requirement?
  1. Enable CCKM on the voice SSID and add APs to a FlexConnect group.
  2. Enable Aironet IE on the voice SSID and add APs to an AP group.
  3. Enable Aironet IE on the voice SSID and add APs to a FlexConnect group.
  4. Enable CCKM on the voice SSID and add APs to an AP group.
Correct answer: A
Explanation:
A: 10 - Mosted
A: 10 - Mosted
Question 7
An engineer in a branch office that does not have a wired backhaul must ensure that local clients can be switched locally and authenticated centrally. In which mode must the AP be configured?
  1. RAP
  2. Flex+Bridge
  3. MAP
  4. Cisco FlexConnect
Correct answer: B
Explanation:
B: 9 - MostedD: 1
B: 9 - MostedD: 1
Question 8
A customer uses a Cisco Catalyst 9800 Series wireless controller to manage all of the APs for a campus network. Secure guest access is required for the guest network. A Cisco 5520 anchor controller is deployed within a DMZ. Which design approach ensures that the mobility tunnel is established successfully between the wireless controller and the anchor controller?
  1. Run an Inter-Release Controller Mobility compatible software version on the wireless controller.
  2. Enable control plane encryption on the wireless controller.
  3. Disable data link encryption on the anchor controller.
  4. Run an Inter-Release Controller Mobility compatible software version on the anchor controller.
Correct answer: D
Explanation:
A: 1D: 14 - Mosted
A: 1D: 14 - Mosted
Question 9
An engineer designed a new wireless network for an enterprise customer. The customer is concerned that some wireless features may not be available because the bill of materials has only Base and no WPlus licenses for the Cisco WLC version 8. What is the reason for the engineer to take this approach regarding the licenses?
  1. OfficeExtend AP needs a WPlus license.
  2. CAPWAP Data Encryption licenses are required for this feature.
  3. All WLC features are available because WPLUS license is now included in the Base license.
  4. To have all the features, Plus licenses must be installed on the WLC.
Correct answer: C
Explanation:
C: 10 - Mosted
C: 10 - Mosted
Question 10
An architect configures a set of AirOS controllers to be in the same mobility group as the existing controllers. The implementation should facilitate inter-controller roaming for users in their new campus. After the configuration, the mobility tunnel is not operational for the data path in the network. Which two validations should be performed? (Choose two.)
  1. firewall port 16666
  2. mping
  3. eping
  4. rping
  5. firewall IP protocol 97
Correct answer: CE
Explanation:
BC: 2CE: 7 - Mosted
BC: 2CE: 7 - Mosted
Question 11
A customer has a single anchor WLC named Anchor A. Anchor A is in a DMZ and provides guest access. The customer wants to deploy an additional anchor controller named Anchor B to provide redundancy if Anchor A fails. Which design approach should be taken for the guest WLAN priority on the foreign WLC for each anchor WLC?
  1. Set Anchor A to priority 3 and Anchor B to priority 3.
  2. Set Anchor A to priority 3 and Anchor B to priority 1.
  3. Set Anchor A to priority 1 and Anchor B to priority 1.
  4. Set Anchor A to priority 1 and Anchor B to priority 3.
Correct answer: D
Explanation:
D: 17 - Mosted
D: 17 - Mosted
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!