Download Integrating HPE Synergy Solutions.HPE0-S50.Prep4Sure.2018-12-06.28q.vcex

Vendor: HP
Exam Code: HPE0-S50
Exam Name: Integrating HPE Synergy Solutions
Date: Dec 06, 2018
File Size: 823 KB
Downloads: 1

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
Refer to the exhibit. 
  
A customer with the configuration shown attempts to configure a server profile for a new application that requires 20Gb of bandwidth, but the configuration fails. The HPE SY 480 Gen9 compute modules have two Intel Xeon E5 – 2695 v4 processors. 256GB of RAM and HPE Synergy 3520C Converged Network Adapters installed. 
What is the likely cause of the configuration failure?
  1. HPE Virtual Connect SE 40Gb F8 Module does not support 20Gb.
  2. Intel Processor does not have enough PCI-e lanes for 20Gb.
  3. HPE 10Gb Interconnect Link Module does not support 20Gb.
  4. Converged Network Adapter is unable to support 20Gb.
Correct answer: C
Question 2
Using composable features, what should a Synergy integrator do to resolve high memory utilization on an HPE Synergy compute module?
  1. Use the API to optimize the memory allocation from the HPE Synergy fluid resource pool.
  2. Increase the allocated physical memory from the HPE Synergy fluid resource pool, and then reboot the compute module.
  3. Take a small outage and reassign the HPE OneView server profile to a higher capacity compute module.
  4. Increase the reversed physical memory in the Server Profile (SP), and then reapply.
Correct answer: B
Question 3
How can a Synergy integrator increase the efficiency with which a Synergy solution can be provisioned? (Choose two.)
  1. Use Powershell to automate configuration and application of server profiles.
  2. Use Image Streamer to provide a stateless OS environment.
  3. Associate all Synergy frames with the same data center.
  4. Use a Multimodule Link Aggregation Group (MLAG) to automate link failover.
  5. Use Composer as a PXE server to automate OS deployments.
Correct answer: AB
Question 4
A customer needs to attach 20 HPE 1TB 6G SAS SFF hard drives to an HPE Synergy 480 Gen9 compute module. The customer needs a fully redundant storage solution. 
Which HPE products meet the customer’s needs? (Choose three.)
  1. HPE D3940 storage module with HPE Synergy D3940 Redundant I/O Adapter.
  2. HPE D3940 storage module with Single I/O Adapter.
  3. two HPE Synergy 12Gb SAS Connection Modules
  4. two HPE Smart Array P542D Controllers
  5. one HPE Smart Array P542D Controller
  6. one HPE Synergy 12Gb SAS Connection Module
Correct answer: AEF
Question 5
A customer needs to collect a support dump from its appliance, but when the customer attempts to save the support dump to a USB drive, no valid USB drive displays as available in the HPE Synergy Management Console. 
Which action should the Synergy integrator propose to the customer?
  1. Verify that the USB being used in no larger than 4GB.
  2. Format the USB drive on a computer prior to collecting the support dump.
  3. Insert the USB drive in any of the compute nodes.
  4. Enable the compute module to format the USB drive prior to collecting the support dump.
Correct answer: B
Question 6
A Synergy integrator has planned a highly available Synergy composable fabric with 20Gb Interconnect Link Modules. 
What is the maximum number of SY 480 Gen9 compute modules the integrator can install into this configuration?
  1. 12
  2. 24
  3. 36
  4. 48
Correct answer: B
Question 7
Refer to the exhibit. 
  
Based on the Synergy configuration shown, what will be the outcome in the event of an end-of-row (EoR) switch failure?
  1. Smartlink will be triggered
  2. There will be no NIC failover.
  3. Uplink bandwidth will decrease.
  4. Server and downlinks will fail.
Correct answer: B
Question 8
Refer to the exhibits. 
  
A customer has a Synergy 2-frame design, as shown above. 
Due to expanding business needs, the customer has ordered a third frame to expand the environment to a 3-frame fabric design, as shown below. 
  
While attempting to extend the Logical Interconnect Group (LIG) for the enclosure group, the Synergy integrator is unable to add the third frame. 
What is preventing the integrator from adding the third frame?
  1. The Virtual Connect SE 40Gb F8 modules are installed in the incorrect location.
  2. The incorrect interconnect Link modules have been installed.
  3. The Frame Link Module firmware has not been updated in the new frame.
  4. The HPE OneView software on the Composer has not been updates to the latest version.
Correct answer: C
Question 9
Refer to the exhibit. 
  
A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules. 
What is the maximum number of compute nodes that the customer’s fabric could support?
  1. 24
  2. 36
  3. 48
  4. 60
Correct answer: B
Question 10
Refer to the exhibit. 
  
How should a Synergy integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
  1. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6.
  2. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
  3. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4.
  4. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.
Correct answer: B
Explanation:
References: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf (13)
References: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf (13)
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!