Download Implementing HPE Composable Infrastructure Solutions.HPE0-S58.PassCertification.2020-02-28.38q.vcex

Vendor: HP
Exam Code: HPE0-S58
Exam Name: Implementing HPE Composable Infrastructure Solutions
Date: Feb 28, 2020
File Size: 2 MB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections?
  1. one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)
  2. two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)
  3. one Image Streamer module in each Synergy frame (3 total)
  4. two Image Streamer modules in frame 1 (2 total)
Correct answer: B
Explanation:
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Question 2
What must an integrator do before an existing cluster can be imported to the HPE Composer?
  1. The vCenter Server must be integrated with the HPE Composer
  2. The cluster must be vSAN enabled
  3. The HPE Composer must have at least two management interfaces to connect to the cluster
  4. The cluster must be enabled for HPE Composer integration
Correct answer: A
Question 3
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames. 
Which configuration steps must the integrator perform to provide the customer with this functionality?
  1. Enable Remote Support and Insight Online Integration in the Composer UI
  2. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
  3. Configure OneView with iLO Amplifier pack
  4. Activate iLO Federation on all installed compute nodes
Correct answer: C
Question 4
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)
  1. assignment of IP addresses for NICs in an operating system
  2. assignment of IP addresses for Composer appliances
  3. assignment of IP addresses for PXE booting to a deployment server
  4. assignment of IP addresses for interconnect modules
  5. assignment of IP addresses for iLOs
Correct answer: DE
Explanation:
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Question 5
An integrator prepares deployment documents with the list of all the hardware and software components. The integrator also needs a list of all infrastructure services deployed, with the functionality described. 
Which services are provided by the vCenter Server component and should be placed in the report? (Choose two.)
  1. Auto Deploy
  2. Single Sign-On
  3. Update Manager
  4. Lookup Service
  5. Certificate Authority
Correct answer: CD
Question 6
A customer needs to evaluate Image Streamer as Proof-of-Concept (PoC) in a test and development tab environment. 
At a minimum, what does a Synergy integrator need in order to support this requirement?
  1. a three-frame environment with redundant composer and Image Streamer appliances
  2. a single frame with single composer and Image Streamer appliances
  3. a two-frame environment with single composer and Image Streamer appliances
  4. a single frame with redundant Image Streamer appliances
Correct answer: B
Question 7
Which storage solution can be used for volume provisioning using HPE Composer?
  1. MSA 2040
  2. HPE StoreEasy 1560
  3. HPE 3PAR StoreServ
  4. HPE XP7 Storage
Correct answer: C
Explanation:
Reference: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf
Reference: https://www.karma-group.ru/upload/iblock/30b/hpe_synergy_composer.pdf
Question 8
A customer needs to aggregate uplink ports from two Virtual Connect interconnects to increase bandwidth and availability of the networks configured for HPE Synergy platform. 
Which steps must the integrator perform in the configuration to meet the customer’s needs?
  1. Connect Satellite modules using Ports L1 and L4
  2. Connect Ports Q7 and Q8 on the Master interconnect Modules (ICM)
  3. Install Redundant Frame Link Modules and a second management ring
  4. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules
Correct answer: A
Question 9
An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs. 
What is the most efficient method the integrator can use to add a new VLAN to each connection?
  1. Add the new VLAN to the network set configured in the profile template, and update the server profile from the template
  2. Add the new VLAN under Edit server profile connections
  3. Add the new VLAN to the network set configured in the profile template
  4. Add the new VLAN under Edit server profile connections in the profile template, and update the server profile from the template
Correct answer: A
Question 10
A customer needs to significantly improve I/O performance to a database server. 
Which product should an integrator implement as part of a Synergy composable solution?
  1. HPE Synergy D3940 storage module with SSD drives
  2. HPE Composer with NVMe drives
  3. HPE Synergy compute module with a Tesla accelerator
  4. HPE Synergy Image Streamer
Correct answer: A
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!