Question 1
During an initial setup of a Synergy environment, an integrator needs to enable or disable authorized Service access.
What will be the outcome when the integrator disables this service?
  1. Authenticated administrators will be unable to make changes to the system
  2. Authorized users will be unable to generate a support dump
  3. Authenticated administrators will be unable to access the system
  4. Authorized support will be unable to diagnose the system
Correct answer: D
Explanation:
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-c05098314 (62)
Reference: https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-c05098314 (62)
Question 2
FILL BLANK
A customer has the following configuration:
Frame 1
  • Bay 1 - HPE Synergy 12Gb SAS Connection Module
  • Bay 2
  • Bay 3 - HPE Virtual Connect SE 40 GB F8 Module
  • Bay 4 - HPE Synergy 12GB SAS Connection Module
  • Bay 5
  • Bay 6 - HPE Synergy 10 Gb Interconnect Link Module
Frame 2
  • Bay 1 - HPE Synergy 12Gb SAS Connection Module
  • Bay 2
  • Bay 3 - HPE Synergy 10Gb Interconnect Link Module
  • Bay 4 - HPE Synergy 12Gb SAS Connection Module
  • Bay 5
  • Bay 6 - HPE Virtual Connect SE 40Gb F8 Module
How many more frames can the customer add to their Synergy composable fabric? (Note: Enter your answer in the answer field below.)
  1. See explanation below.
Correct answer: 1
Explanation:
Frame 1 - Bay 2 - HPE Virtual Connect SE 100Gb F32 Module for Synergy(867796-B21)Frame 1 - Bay 5 - HPE Virtual Connect SE 16Gb Fibre Channel Module forSynergy (779227-B21)Frame 2 - Bay 2 - Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A) Frame 2 - Bay 5 - HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449-B21)
Frame 1 - Bay 2 - HPE Virtual Connect SE 100Gb F32 Module for Synergy
(867796-B21)
Frame 1 - Bay 5 - HPE Virtual Connect SE 16Gb Fibre Channel Module for
Synergy (779227-B21)
Frame 2 - Bay 2 - Brocade 16Gb/24 Power Pack+ Fibre Channel SAN Switch Module for HPE Synergy (K2Q86A) Frame 2 - Bay 5 - HPE Synergy 4820C 10/20/25Gb Converged Network Adapter (876449-B21)
Question 3
In a 3-frame HPE Synergy environment, how should an integrator place the image Streamer modules to allow for redundancy to all of the management connections? 
  1. one Image Streamer module in frame 2, and a second Image Streamer Module in frame 3 (2 total)
  2. two Image Streamer modules in frame 2, and two Image Streamer modules in frame 3 (4 total)
  3. one Image Streamer module in each Synergy frame (3 total)
  4. two Image Streamer modules in frame 1 (2 total)
Correct answer: B
Explanation:
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Reference: https://www.karma-group.ru/upload/iblock/2be/synergy_image_streamer.pdf (page 7)
Question 4
What must an integrator do before an existing cluster can be imported to the HPE Composer?
  1. The vCenter Server must be integrated with the HPE Composer
  2. The cluster must be vSAN enabled
  3. The HPE Composer must have at least two management interfaces to connect to the cluster
  4. The cluster must be enabled for HPE Composer integration
Correct answer: A
Question 5
Refer to the exhibit. 
How should an integrator pair interconnect bays to set up redundant fabrics in an HPE Synergy 12000 Frame?
  1. Interconnect bays 1 and 2; bays 3 and 4; bays 5 and 6. 
  2. Interconnect bays 1 and 6; bays 2 and 5; bays 3 and 4. 
  3. Interconnect bays 1 and 4; bays 2 and 5; bays 3 and 6.
  4. Interconnect bays 1 and 3; bays 2 and 4; bays 5 and 6.
Correct answer: C
Explanation:
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815113.pdf
Question 6
Refer to the exhibit. 
An integrator needs to add an FCoE connection to the server profile, but the FCoE connection type is not available.
What is the likely cause of this issue?
  1. FCoE capable interconnect modules are not installed in the Synergy frame
  2. Defined FCoE network is not associated with a SAN or does not have VLAN Id defined
  3. A FCoE connection is not available, as there is no LIG configured for FCoE connectivity
  4. The FCoE connection has not been added as a Fibre Channel connection within a server profile
Correct answer: D
Question 7
An integrator is installing three Synergy frames in different locations for a customer. As part of the installation, the customer requests a single monitoring dashboard that shows the current hardware status, warranty status, and open support cases of all three frames.
Which configuration steps must the integrator perform to provide the customer with this functionality?
  1. Enable Remote Support and Insight Online Integration in the Composer UI
  2. Install Insight Remote Support Advanced, and integrate it with HPE Global Dashboard
  3. Configure OneView with iLO Amplifier pack
  4. Activate iLO Federation on all installed compute nodes
Correct answer: C
Question 8
What are valid uses for an IPv4 address pool when configuring an HPE Synergy solution? (Choose two.)
  1. assignment of IP addresses for NICs in an operating system
  2. assignment of IP addresses for Composer appliances
  3. assignment of IP addresses for PXE booting to a deployment server
  4. assignment of IP addresses for interconnect modules 
  5. assignment of IP addresses for iLOs
Correct answer: DE
Explanation:
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Reference: https://techlibrary.hpe.com/docs/synergy/shared/setup_overview/index.html
Question 9
A customer has the following HPE Synergy solution: 
  • three Synergy frames 
  • two HPE Virtual Connect SE 32Gb Fibre Channel (FC) modules in each time 
  • two HPE Virtual Connect SE 40GB F8 modules 
  • four HPE Synergy 10Gb Interconnect Link Modules
Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.
Correct answer: To display the answer, ProfExam Simulator is required.
Explanation:
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815258.pdf
Reference: https://h20195.www2.hpe.com/v2/GetPDF.aspx/c04815258.pdf
Question 10
Which policy can an integrator apply when creating a datastore using HPE OneView for vCenter Server?
  1. Data at Rest encryption policy
  2. Round Robin load balancing policy
  3. Recovery Manager Central policy
  4. virtual machine Restart policy
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!