Download ISTQB Certified Tester Advanced Level - Test Analyst [Syllabus 2012].CTAL-TA_Syll2012.PassCertification.2018-12-13.32q.vcex

Vendor: iSQI
Exam Code: CTAL-TA_Syll2012
Exam Name: ISTQB Certified Tester Advanced Level - Test Analyst [Syllabus 2012]
Date: Dec 13, 2018
File Size: 371 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
Working together with the test manager during test planning, which of the following activities is NOT expected to be performed by the test analyst?
  1. Review the test estimates of the test manager
  2. Review the test plan for non-functional testing
  3. Organize adequate test resources
  4. Being involved in risk management sessions
Correct answer: C
Question 2
Which of the following statements is TRUE with respect to when the test analyst should become involved during different lifecycle models? 
  1. In a sequential V-model project the test analyst should start test analysis and design concurrently with coding
  2. In Agile projects the test analyst should start test analysis and design concurrently with coding
  3. In a sequential model project the test analyst should start test analysis and design concurrently with software design
  4. In an embedded iterative model the test analyst should expect to be involved in the standard planning and design aspects
Correct answer: D
Question 3
Which of the following is a type of testing that someone in the role of a test analyst, working with the test manager, should typically consider and plan for?
  1. Security testing
  2. Reliability testing
  3. Accessibility testing
  4. Performance testing
Correct answer: C
Question 4
You are working as a tester on a project to develop a point-of-sales system for grocery stores. Which of the following is a product risk that could be identified for such a system?
  1. The arrival of a more reliable competing product on the market
  2. Delivery of an incomplete test release to the first cycle of system test
  3. An excessively high number of defect fixes fail during re-testing
  4. Failure to accept allowed credit cards
Correct answer: D
Question 5
Which of the following is the LEAST appropriate action to mitigate product risks for a web application?
  1. Initiate reviews of test design
  2. Use professional and skilled testers with appropriate technical knowledge
  3. Run tests in multiple operational environments
  4. Allocate more time to high risk areas
Correct answer: A
Question 6
According to the ISTQB Advanced syllabus, which of the following would be the MOST effective method of communication between test team members who are distributed across several time zones?
  1. Accurate recording of defect information in the defect tracking system
  2. Accepting frequent builds from the developers to keep all testers working on the same version at the same time
  3. Skype meetings for personal interaction
  4. Weekly, mandatory meeting with all personnel present
Correct answer: A
Question 7
A new banking system has 2 customers’ types, 2 account types and will operate in two different countries?  
How many test cases will be needed using the pair wise testing technique and the appropriate 2-wise orthogonal array?
  1. 2
  2. 4
  3. 5
  4. 8
Correct answer: B
Explanation:
Question 8
You are applying pairwise testing and using orthogonal arrays. The following steps are all part of the process to be followed.  
i) Determine the number of choices for each variable 
ii) Map the test problem onto the orthogonal array 
iii) Construct the test cases 
iv) Identify the variables 
v) Locate an appropriate orthogonal array  
What is the correct order of the above mentioned process steps?
  1. i, ii, iv, v, iii
  2. iv, ii, v, iii, i
  3. iv, i, iii, v, ii
  4. iv, i, v, ii, iii
Correct answer: D
Question 9
While identifying scenario’s for the use case “copy A4 – A4” for a new copier, the following scenario’s were identified:
Basic scenario: single side to single side
Deviations: single side to double side, copy of a set, copy using the automatic document feeder
Failures: no paper in paper tray, paper jam, out of staples
How many test cases will be needed to achieve minimum coverage?
  1. 1
  2. 4
  3. 5
  4. 7
Correct answer: D
Explanation:
Question 10
While identifying scenario’s for the use case “copy A4 – A4” for a new copier, the following scenario’s were identified:
Basic scenario: single side to single side
Deviations: single side to double side, copy of a set, copy using the automatic document feeder
Failures: no paper in paper tray, paper jam, out of staples
During interviews with both development and end-users it has been established that the failure scenario’s can occur during the basic scenario and during each of the deviations. 
How many test cases will be needed to achieve full coverage both for valid and invalid situations? 
  1. 10
  2. 12
  3. 16
  4. 20
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!