Download Certified Tester - Foundation Level (Syllabus 2011).CTFL-Foundation.Train4Sure.2018-12-22.86q.vcex

Vendor: iSQI
Exam Code: CTFL-Foundation
Exam Name: Certified Tester - Foundation Level (Syllabus 2011)
Date: Dec 22, 2018
File Size: 503 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
А garden irrigation system allows the user to specify 2 inputs. 
  1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times 
  2. Duration - The duration of operation, in whole minutes, each time it is switched on, ranging from 1 to 60 
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?
  1. Frequency 1, 5; Duration 1, 60
  2. Frequency 0, 1, 5, 6; Duration 59 seconds, 1 minute, 60 minutes, 60 minutes 1 second
  3. Frequency 0, 1, 5, 6; Duration 0, 1, 60, 61
  4. Frequency 0, 1, 2, 5, 6; Duration 0, 1, 30, 60, 61
Correct answer: B
Question 2
  
The decision table above reflects a golf club’s pricing structure for green fees and buggy/cart hire. 
What is the expected result (actions) for each of the following two test cases (TC1 and TC2)? 
  • TC1 - Paul is not a full member, is a Loyalty Card holder and requests to play 18 holes with a buggy/cart 
  • TС2 - Cheryl is not a full member, doesn’t have a Loyalty Card and requests to play 9 holes with a buggy/cart
  1. TC1 - £23 total charge including buggy hire; TC2 - £21 total charge including buggy hire
  2. TC1 - £18 total charge including buggy hire; TC2 - £16 total charge but no buggy allowed
  3. TC1 - £23 total charge including buggy hire; TC2 - £16 total charge but no buggy allowed
  4. TC1 - £17 total charge but no buggy allowed; TC2 - £21 total charge including buggy hire
Correct answer: C
Question 3
Which of the following activities is appropriate to the test planning stage?
  1. Analyzing the test basis
  2. Assigning resources for the planned activities
  3. Designing the test environments
  4. Writing a test execution schedule
Correct answer: B
Question 4
Testing effort can depend on a number of factors, which one of the following is MOST likely to impact the amount of effort required?
  1. The predicted number of defects and the amount of network required
  2. The ratio of developers to testers in the project team
  3. The planned use of a project management tool to schedule tasks
  4. The responsibilities for testers and developers being clearly defined
Correct answer: C
Question 5
А booking system for a city bus service prices its fares according to the time of travel:
  • Peak-time tariff starts at 0600 and finishes at 1000 am 
  • Off-peak tariff applies during all other times of service 
  • The bus service does not operate between 2300 and the start of the next day's peak service 
Note that all times mentioned are inclusive. 
When applying the equivalence partitioning test design technique, which of the following options shows test case inputs that each fall into a different equivalence partition?
  1. 0600, 1000, 1200
  2. 1001, 1300, 2259
  3. 0100, 0800, 2200
  4. 2400, 1000, 2301
Correct answer: C
Question 6
Which of the following is a white-box test technique?
  1. Decision table testing
  2. Exploratory testing
  3. Statement testing
  4. Error guessing
Correct answer: C
Question 7
  
In the above State Table, which of the following represents an invalid transition?
  1. Event C from S3
  2. Event E from S4
  3. Event B from S2
  4. Event D from S4
Correct answer: C
Question 8
  
The decision table above shows a company's fuel expenses structure. 
Which of the following Test Cases based on the decision table are Valid? 
Test Case 1:
An employee who is not a car or motorcycle driver attempts to claim fuel expenses. Expected result: Expense claim not allowed.
Test Case 2:
An employee who drives a 1700cc diesel car attempts to claim fuel expenses. Expected result: Expense claim accepted at band C.
Test Case 3:
An employee who rides a motorcycle attempts to claim fuel expenses. Expected result: Expense claim accepted at band A.
  1. Test Cases 1 and 3 are Valid. Test Case 2 is Invalid.
  2. Test Cases 2 and 3 are Valid. Test Case 1 is Invalid.
  3. Test Cases 1, 2 and 3 are all Valid.
  4. Test Case 2 is Valid. Test Cases 1 and 3 are Invalid.
Correct answer: A
Question 9
Which of the following options describe the causal chain in the correct sequence?
  1. Error, fault, failure
  2. Fault, bug, mistake
  3. Mistake, failure, fault
  4. Failure, bug, error
Correct answer: A
Question 10
Which of the following would achieve the HIGHEST level of testing independence for a project's system test level?
  1. Training developers to design good tests for the test team to execute
  2. Outsourcing test design and execution to a different company
  3. Having the company's independent test team design and execute the tests
  4. Minimizing contact between testers and developers during test design to avoid bias
Correct answer: A
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!