Question 1
Select the correct statements about safety critical systems; 
I . Risk management reduces the likelihood and / or impact of a risk. 
II . Failure Mode and Effect Analysis (FMEA) technique is used mainly for safety critical systems. 
III . All safety critical systems are subject to sector specific regulations only. 
IV . Full traceability from requirements to evidence is required in some safety critical systems.
  1. I, II, IV true, III false
  2. II,III, IV true, I false
  3. I, IV true, II, III false
  4. All of the above true
Correct answer: A
Question 2
Select the correct statement regarding test planning and control
  1. Test controlling is a one-time activity that will occur at the beginning of the test effort.
  2. Test planning includes identifying test activities and resources required for the test effort.
  3. Complex relationships (many to many, one to many) cannot exist among test conditions, test cases and test procedures.
  4. Risk and Test coverage is not a metric for test planning and control.
Correct answer: B
Question 3
Select the correct statement; 
I . Comparing actual progress against the plan is part of Test Controlling activity. 
II . Updating the test plan if needed is part of test controlling activity. 
Ill. Prioritization criteria identified during risk analysis should be applied only during test execution. 
IV . Test conditions are identified by analyzing the test basis and test objectives.
  1. I and IV true. II and II false.
  2. I, II and IV true. III false.
  3. I, II and III true. IV false.
  4. II, III and IV true. I false.
Correct answer: B
Question 4
The main Objective of Test Analysis and Design phase is to;
  1. Create test strategy and test plan
  2. Design and create the test environment
  3. Identify test conditions and create test cases
  4. Archive test results, logs and reports in the configuration management system 
Correct answer: C
Question 5
Which of the statements are true about test cases? 
I . All test cases should be automated 
II . Test cases should be repeatable 
III . Test cases should be traceable back to requirements 
IV . Test cases should have expected results
  1. I,II and III are true, IV is false
  2. II,III and IV are true, I is false
  3. III and IV are true , I and II false
  4. All of them are true
Correct answer: B
Question 6
According to the ISTQB syllabus, Test Analysis and Design phase metrics include,
  1. Percentage of requirements covered by test conditions, percentage of test conditions covered by test cases and number of defects found during test analysis and design.
  2. Percentage of requirements covered by test conditions, percentage of test conditions covered by test cases and percentage of test cases automated.
  3. Percentage of requirements covered by test conditions, percentage of test cases automated and percentage of test environment configured.
  4. Percentage of test cases automated, percentage of test cases executed and percentage of test environment configured.
Correct answer: A
Question 7
Objectives of test implementation phase are;
  1. Create test procedures.
  2. Finalize and create test data and set up environment
  3. Create a test execution schedule / order
  4. Check test level entry criteria
Correct answer: C
Question 8
Select the correct answer;
  1. If the expected and actual results do not match, it is always because of a defect in the software under test.
  2. Customers should not be involved in any level of test execution.
  3. Collecting test evidence / test logging is always up to the tester to decide.
  4. Actual and expected results comparison is part of test execution phase.
Correct answer: D
Question 9
Select the correct answer; 
I . IEEE 829 contains a standard for test summary report. 
II. Test reporting can occur at the end of the testing effort. 
III . Percentage of test time lost due to blocking events is not a valid metric to monitor. 
IV . Test summary report may contain summary of testing activities, versions of the software tested and management approvals.
  1. I, II and III are true, IV false
  2. I and II true, III and IV are false
  3. I, II and IV are true, III false
  4. I and IV are true, II and III are false
Correct answer: C
Question 10
The testing department of a leading company delivered a software, which included the three new features along with the test qualification report. They also archived their test results, logs, and other test artifacts in company documentation database. Scheduled a lessons learned meeting with the software testers, project managers and software developers. The testing department is describing;
  1. Test analysis activities
  2. Test planning activities
  3. Test closure activities
  4. User acceptance testing activities
Correct answer: C
Explanation:
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!