Demo Questions

Question 1
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for your organization. You want to settle costs and revenue of a sales order item to a profitability segment. What do you need to configure?
  1. Source structure
  2. Cost component structure
  3. A transfer structure
  4. Allocation structure
Correct answer: C
Explanation:
Detailed Explanation: For settling costs and revenue to a profitability segment in account-based profitability analysis, a transfer structure (option C) is essential. This structure maps cost elements to profitability segments, which enables direct posting of costs and revenues for specific segments in SAP S/4HANA Management Accounting.
Detailed Explanation: For settling costs and revenue to a profitability segment in account-based profitability analysis, a transfer structure (option C) is essential. This structure maps cost elements to profitability segments, which enables direct posting of costs and revenues for specific segments in SAP S/4HANA Management Accounting.
Question 2
You are creating a new activity type and want to maintain plan prices for a cost center. Which attributes must you configure in the activity type master record?
Note: There are 3 correct answers to this question.
  1. Output quantity
  2. CO version
  3. Valid cost center categories
  4. Activity type category
  5. Price indicator
Correct answer: B, C, D
Explanation:
Detailed Explanation: For maintaining plan prices of a cost center, the activity type master record should include the CO version (option B), valid cost center categories (option C), and the activity type category (option D). These attributes ensure accurate cost allocation and pricing within SAP S/4HANA.
Detailed Explanation: For maintaining plan prices of a cost center, the activity type master record should include the CO version (option B), valid cost center categories (option C), and the activity type category (option D). These attributes ensure accurate cost allocation and pricing within SAP S/4HANA.
Question 3
You are implementing SAP S/4HANA and you want to run analytical reports off a single data model. Which statement best describes reporting in SAP S/4HANA?
  1. Reporting can be either broad and deep for analysis, or speedy and simple, but not both.
  2. Reporting analytical data is always done in a business warehouse system.
  3. Reporting on data is available in real-time at every level of detail.
  4. Reporting on data in real time is difficult, and complex to design.
Correct answer: C
Question 4
Which of the following statements best describe Product Cost by Order?
Note: There are 2 correct answers to this question.
  1. It is recommended for products with a long production time.
  2. It is used when full cost traceability is needed.
  3. It is used when controlling by individual production lots or discrete quantities is needed.
  4. It is used when you perform repetitive manufacturing.
Correct answer: B, C
Explanation:
Detailed Explanation: Product Cost by Order is suitable for scenarios requiring full cost traceability (option B) and individual control of production lots (option C). This is especially useful in discrete manufacturing environments where specific lot costing is necessary.
Detailed Explanation: Product Cost by Order is suitable for scenarios requiring full cost traceability (option B) and individual control of production lots (option C). This is especially useful in discrete manufacturing environments where specific lot costing is necessary.
Question 5
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.
  1. WBS element
  2. General ledger account
  3. Sales order item
  4. Network
  5. Asset
Correct answer: A, C, D
Question 6
Which statement best describes the Query Browser for reporting?
  1. It is the frontend used to define reports in Analysis for Office.
  2. It is available as an additional license product in SAP S/4HANA.
  3. It is a desktop browser that integrates with SAP S/4HANA.
  4. It is a design studio app that comes as standard SAP Fiori content.
Correct answer: C
Question 7
You are setting up costing-based Profitability Analysis for your organization.
What are related configuration activities?
Note: There are 3 correct answers to this question.
  1. Enable attributed profitability analysis
  2. Configure account determination for COGS split
  3. Define characteristics
  4. Assign value fields to conditions
  5. Configure summarization levels
Correct answer: C, D, E
Explanation:
Detailed Explanation:Setting up costing-based Profitability Analysis involves defining characteristics, assigning value fields to conditions, and configuring summarization levels. These steps enable detailed reporting and segmentation of profitability data in SAP S/4HANA.
Detailed Explanation:Setting up costing-based Profitability Analysis involves defining characteristics, assigning value fields to conditions, and configuring summarization levels. These steps enable detailed reporting and segmentation of profitability data in SAP S/4HANA.
Question 8
Why would you use manual cost allocation in Controlling?
Note: There are 2 correct answers to this question.
  1. To run simple allocations of plan data
  2. To run simple allocations of actual data
  3. To correct secondary postings
  4. To allocate costs using an allocation cycle
Correct answer: B, C
Explanation:
Detailed Explanation: Manual cost allocation allows for simple allocations of actual data (option B) and correction of secondary postings (option C). This functionality is helpful in making quick adjustments without running complex allocation cycles in SAP S/4HANA Management Accounting.
Detailed Explanation: Manual cost allocation allows for simple allocations of actual data (option B) and correction of secondary postings (option C). This functionality is helpful in making quick adjustments without running complex allocation cycles in SAP S/4HANA Management Accounting.
Question 9
How does SAP S/4HANA capture costs?
Note: There are 2 correct answers to this question.
  1. Only primary costs are captured in general ledger accounts.
  2. Secondary costs are captured in extension ledger CO that references the leading ledger.
  3. Primary and secondary costs are captured on cost elements.
  4. Primary and secondary costs are captured in general ledger accounts.
Correct answer: C, D
Explanation:
Detailed Explanation:SAP S/4HANA consolidates both primary and secondary costs within the universal journal in the general ledger, ensuring a streamlined and comprehensive approach to financial reporting. This unified approach enables transparent cost tracking and efficient integration between Financial Accounting (FI) and Management Accounting (CO).
Detailed Explanation:SAP S/4HANA consolidates both primary and secondary costs within the universal journal in the general ledger, ensuring a streamlined and comprehensive approach to financial reporting. This unified approach enables transparent cost tracking and efficient integration between Financial Accounting (FI) and Management Accounting (CO).
Question 10
At which level do you define the valuation method for results analysis?
  1. Operating concern
  2. Plant
  3. Controlling area
  4. Company code
Correct answer: C
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX FILES

Use ProfExam Simulator to open VCEX files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!