Download Professional Scrum Developer (PSD).PSD.CertExams.2024-05-16.305q.vcex

Vendor: Scrum
Exam Code: PSD
Exam Name: Professional Scrum Developer (PSD)
Date: May 16, 2024
File Size: 342 KB

How to open VCEX files?

Files with VCEX extension can be opened by ProfExam Simulator.

Purchase
Coupon: EXAM_HUB

Discount: 20%

Demo Questions

Question 1
When can Product Backlog Refinement occur?
  1. Only during Sprint Planning.
  2. Anytime during the Sprint.
  3. Only during Refinement meetings planned by the Product Owner.
  4. Before Sprint Planning.
Correct answer: B
Question 2
What would NOT be considered Refactoring?
  1. Reordering method parameters to improve readability.
  2. Extracting interfaces.
  3. Renaming things to be more logical.
  4. Changing external interfaces or APIS.
  5. Extracting methods.
Correct answer: D
Question 3
Your Scrum Team is one of seven teams working on a Software Product. All teams use the same Version Control System. Which is the best approach to deliver a high-quality Increment?
  1. Developers should perform a combination of local and private builds.
  2. Each team's automated build is integrated toward the end of the Sprint.
  3. There is one automated and integrated build for all seven teams.
  4. Each team should have its own automated build.
Correct answer: C
Question 4
Who creates documentation included with an Increment?
  1. The Developers.
  2. Increments do not need documentation.
  3. The Product Owner.
  4. Technical Writers.
  5. The Scrum Master.
Correct answer: A
Question 5
What is a merge in a Version Control System?
  1. Copying a portion of a code base to isolate it from the original codebase.
  2. Identifying a particular codebase as ready for distribution.
  3. Triggering a Deployment into Production.
  4. Combining two or more versions of code into a single codebase.
Correct answer: D
Question 6
Which three of the following are feedback loops in Scrum?
  1. Daily Scrum.
  2. Release Planning.
  3. Sprint Review.
  4. Refinement Meeting.
  5. Sprint Retrospective.
Correct answer: ACE
Question 7
Which four types of tests can be included in an automated test harness?
  1. Performance.
  2. Exploratory.
  3. Unit.
  4. Functional.
  5. Manual regression.
  6. Integration.
Correct answer: ACDF
Question 8
Which concept is described by the Last Responsible Moment?
  1. Making decisions as soon as possible to close feedback loops as soon as possible.
  2. Discover decisions to be made as soon as possible but postpone deciding to the latest reasonable moment.
  3. The last moment in a Sprint when code changes are allowed, after this only stabilization work should be conducted.
  4. Opening a learning window to validate hypotheses and create learning.
  5. The last moment a Developer is responsible for quality, after this the Tester is responsible.
Correct answer: B
Question 9
Choose four desirable characteristics of a Unit Test.
  1. Includes exercising the persistence layer.
  2. Makes assertions about only one logical concept.
  3. Independent of others.
  4. Test code is as small as possible.
  5. Execution is fast.
Correct answer: BCDE
Question 10
Why does a test written using TDD (Test Driven Development) initially fail?
  1. Because the test has not been refactored.
  2. Because it has to be put into an automated test harness to be run.
  3. Because the tests are checked in before the Product code exists.
  4. Because the Product code to satisfy the test does not yet exist.
Correct answer: D
HOW TO OPEN VCE FILES

Use VCE Exam Simulator to open VCE files
Avanaset

HOW TO OPEN VCEX AND EXAM FILES

Use ProfExam Simulator to open VCEX and EXAM files
ProfExam Screen

ProfExam
ProfExam at a 20% markdown

You have the opportunity to purchase ProfExam at a 20% reduced price

Get Now!